Block tariff reform
Time-of-use penalties
Voltpoint converts 15-minute smart meter profiles, ENTSO-E spot prices, and grid block tariffs into bankable battery storage decisions — sized, simulated, subsidised, and dispatched by AI.
MojElektro API · ENTSO-E 10YSI · PVGIS · Borzen grant filing
SITE LOAD · 15-MIN INTERVALS
Europe's 5-block network tariff reform, volatile day-ahead markets, and 15-minute peak penalties have turned passive consumption into a recurring loss.
Time-of-use penalties
15-minute power spikes
Day-ahead exposure
Weeks per study · 15–20 hours in error-prone spreadsheets
MojElektro 15-min OBIS via API or CSV, ENTSO-E spot prices, PVGIS solar synthesis, preflight audits
→Optimal agreed power per tariff block, up to €2.5k/yr saved
→Vectorized dispatch across 35,040 intervals, arbitrage + peak shaving + solar self-consumption, under a second
→Executive PDF pre-feasibility, 15-year degraded NPV, Borzen subsidy filings included
Grid fee reduction
40 kWh / 20 kW · Manufacturing
Six-month grid fees cut from €1,782 to €478 through peak shaving, with an €8,300 Borzen grant.
Annual arbitrage discharged
100 kWh / 50 kW · Hospitality
Dynamic price arbitrage and 24/7 load management on a €15k net investment after subsidy.
Return on investment
100 kWh / 50 kW · Commercial
Six configurations compared; solar-only charging won with a 7.5-year simple payback.
Annual net profit
5 MWh / 5 MW · Heavy industry
Solar utilization lifted to 88.4% with €1.66M cumulative 15-year return.
| Project | System | Strategy | Net CapEx | Annual net | Payback |
|---|---|---|---|---|---|
| Stinako d.o.o. | 40 kWh / 20 kW | Peak shaving + grid fee | €10,144 | €2,200–2,600 | 4.2 yr |
| Hotel Lonec | 100 kWh / 50 kW | Arbitrage + load shift | €15,000 | ~€2,500 | 6.0 yr |
| Postojna Site | 100 kWh / 50 kW | Solar self-consumption | €15,000 | €499 | 7.5 yr |
| Utility Industrial | 5 MWh / 5 MW | Utility arbitrage + solar | Custom | €129,943 | 15.4 yr |
Slovenian public grants cover up to 45% of eligible BESS cost. Voltpoint prepares the full administrative dossier — cutting payback horizons by 40–50%. Stinako's grant alone: €8,299.61.
Facility managers
Energy advisors & EPCs
BESS manufacturers
Grid operators
Upload 12 months of 15-minute meter data — or link your MojElektro account — and get a bankable pre-feasibility report with sized candidates, subsidy modeling, and a 15-year cash flow.